docs(state): record phase 15 context session

This commit is contained in:
lorentz 2026-07-15 06:56:47 -04:00
parent d3ff9d088b
commit 7fa94cb6a5

View file

@ -3,8 +3,9 @@ gsd_state_version: 1.0
milestone: v3.0 milestone: v3.0
milestone_name: Phishing Triage Automation milestone_name: Phishing Triage Automation
status: planning status: planning
last_updated: "2026-07-14T00:00:00.000Z" stopped_at: Phase 15 context gathered
last_activity: 2026-07-14 last_updated: "2026-07-15T10:56:47.034Z"
last_activity: 2026-07-14 — v3.0 ROADMAP.md created, 26/26 requirements mapped across Phases 15-21
progress: progress:
total_phases: 7 total_phases: 7
completed_phases: 0 completed_phases: 0
@ -66,19 +67,24 @@ Recent decisions affecting current work:
the Phase 15 schema and could be built in parallel with Phase 16 (EML the Phase 15 schema and could be built in parallel with Phase 16 (EML
parser) if split across two workstreams — sequenced after 16 here for a parser) if split across two workstreams — sequenced after 16 here for a
single execution thread single execution thread
- The durable schema (campaigns/reports/messages/indicators/classifications/ - The durable schema (campaigns/reports/messages/indicators/classifications/
remediation_actions/audit_events) lands in Phase 15, before any service remediation_actions/audit_events) lands in Phase 15, before any service
that writes to it — new migration, next number after 096 (097+) that writes to it — new migration, next number after 096 (097+)
- ACCESS-01 is mapped to Phase 18 (the first phase introducing - ACCESS-01 is mapped to Phase 18 (the first phase introducing
`/api/phishing/*` routes) rather than a standalone terminal phase; every `/api/phishing/*` routes) rather than a standalone terminal phase; every
later phishing endpoint (19, 20, 21) is expected to continue enforcing the later phishing endpoint (19, 20, 21) is expected to continue enforcing the
same `requireAuth`/`requirePermission` convention as a success-criteria same `requireAuth`/`requirePermission` convention as a success-criteria
carry-forward, not a re-mapped requirement carry-forward, not a re-mapped requirement
- Classification (Phase 19) is sequenced after both Phase 17 (blast-radius) - Classification (Phase 19) is sequenced after both Phase 17 (blast-radius)
and Phase 18 (campaigns) since it needs both as inputs and Phase 18 (campaigns) since it needs both as inputs
- Remediation/approval/audit (Phase 20) is sequenced after Phase 18 - Remediation/approval/audit (Phase 20) is sequenced after Phase 18
(campaigns) and Phase 19 (classifications) — can't approve/gate an action (campaigns) and Phase 19 (classifications) — can't approve/gate an action
that doesn't reference either that doesn't reference either
- Autotask triage note (Phase 21) is last — its content summarizes - Autotask triage note (Phase 21) is last — its content summarizes
classification + blast radius + recommended/approved remediation state, classification + blast radius + recommended/approved remediation state,
so it has nothing to summarize until Phases 19-20 exist so it has nothing to summarize until Phases 19-20 exist
@ -109,7 +115,7 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity ## Session Continuity
Last session: 2026-07-14T00:00:00.000Z Last session: 2026-07-15T10:56:47.031Z
Stopped at: v3.0 ROADMAP.md and STATE.md created; REQUIREMENTS.md traceability populated Stopped at: Phase 15 context gathered
Resume file: None — next step is `/gsd:plan-phase 15` Resume file: .planning/phases/15-data-model-detection-ticket-evidence/15-CONTEXT.md
</content> </content>