docs(phase-24): mark 24-07 plan complete in ROADMAP (7/7)
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
This commit is contained in:
parent
820e5c584b
commit
979554d4dc
1 changed files with 2 additions and 2 deletions
|
|
@ -682,7 +682,7 @@ Phases execute in numeric order. v1.0 (Phases 1-9.1) shipped 2026-07-10. v2.0 (P
|
||||||
**Goal:** Sync DNS zones/records from AWS Route 53 into Postgres, support full CRUD back to Route 53 from Pulse, track record-level changes over time, log every sync and CRUD operation for audit, and integrate into the existing per-system sync section (scheduler, admin UI, health checks) alongside Autotask/Datto RMM/Veeam. AWS credentials are resolved via BWS (Bitwarden Secrets Manager), not plaintext env vars.
|
**Goal:** Sync DNS zones/records from AWS Route 53 into Postgres, support full CRUD back to Route 53 from Pulse, track record-level changes over time, log every sync and CRUD operation for audit, and integrate into the existing per-system sync section (scheduler, admin UI, health checks) alongside Autotask/Datto RMM/Veeam. AWS credentials are resolved via BWS (Bitwarden Secrets Manager), not plaintext env vars.
|
||||||
**Requirements**: SC-1, SC-2, SC-3, SC-4, SC-5, SC-6 (the numbered Success Criteria below serve as this phase's requirement IDs — this project has no REQUIREMENTS.md)
|
**Requirements**: SC-1, SC-2, SC-3, SC-4, SC-5, SC-6 (the numbered Success Criteria below serve as this phase's requirement IDs — this project has no REQUIREMENTS.md)
|
||||||
**Depends on:** Phase 23
|
**Depends on:** Phase 23
|
||||||
**Plans:** 6/7 plans executed
|
**Plans:** 7/7 plans complete
|
||||||
|
|
||||||
Plans:
|
Plans:
|
||||||
**Wave 1**
|
**Wave 1**
|
||||||
|
|
@ -702,7 +702,7 @@ Plans:
|
||||||
|
|
||||||
**Wave 4** *(blocked on Wave 3 completion)*
|
**Wave 4** *(blocked on Wave 3 completion)*
|
||||||
|
|
||||||
- [ ] 24-07-PLAN.md — `/admin/sync/route53` detail page, record editor dialog, end-to-end phase verification *(wave 4)*
|
- [x] 24-07-PLAN.md — `/admin/sync/route53` detail page, record editor dialog, end-to-end phase verification *(wave 4)*
|
||||||
|
|
||||||
**Success Criteria:**
|
**Success Criteria:**
|
||||||
|
|
||||||
|
|
|
||||||
Loading…
Add table
Add a link
Reference in a new issue