docs(14-06): record human verification checkpoint approval
This commit is contained in:
parent
3bf0244648
commit
a6f5ca39a3
1 changed files with 75 additions and 0 deletions
75
.planning/phases/14-pax8-ui-surface/14-06-SUMMARY.md
Normal file
75
.planning/phases/14-pax8-ui-surface/14-06-SUMMARY.md
Normal file
|
|
@ -0,0 +1,75 @@
|
|||
---
|
||||
phase: 14-pax8-ui-surface
|
||||
plan: 06
|
||||
subsystem: ui
|
||||
tags: [verification, pax8, react, postgres]
|
||||
|
||||
requires:
|
||||
- phase: 14-pax8-ui-surface (plans 01-05)
|
||||
provides: /pax8 page, PAX8 API routes, DetailModal extension, Needs Review tab
|
||||
provides:
|
||||
- Human-confirmed acceptance of all four Phase 14 success criteria
|
||||
- Confirmed D-07/D-08 view/resolve permission split holds at runtime
|
||||
- Confirmed manual company-match resolutions survive a live PAX8 sync
|
||||
affects: [pax8-integration-milestone-close]
|
||||
|
||||
tech-stack:
|
||||
added: []
|
||||
patterns: []
|
||||
|
||||
key-files:
|
||||
created:
|
||||
- .planning/phases/14-pax8-ui-surface/14-06-SUMMARY.md
|
||||
modified: []
|
||||
|
||||
key-decisions:
|
||||
- "Pre-existing itglue-search.test.ts failures (2/221) confirmed unrelated to this phase — reproduced identically against the pre-wave-1 base commit — and accepted as out-of-scope for the phase gate"
|
||||
|
||||
patterns-established: []
|
||||
|
||||
requirements-completed: [PAX8-12, PAX8-13, PAX8-14]
|
||||
|
||||
duration: ~15min
|
||||
completed: 2026-07-11
|
||||
---
|
||||
|
||||
# Phase 14: pax8-ui-surface Summary
|
||||
|
||||
**Human verification confirmed the complete `/pax8` surface (company list, cost breakdown, review queue, resolve + persist-through-sync, and admin/non-admin permission split) works end-to-end against the live dev database.**
|
||||
|
||||
## Performance
|
||||
|
||||
- **Duration:** ~15 min (checkpoint only — no code changes)
|
||||
- **Tasks:** 2/2 (automated gate + human verification)
|
||||
- **Files modified:** 0
|
||||
|
||||
## Accomplishments
|
||||
- Automated gate: `npx tsc --noEmit --pretty` clean; `pax8-company-match-resolver.test.ts` 5/5 passing
|
||||
- Human click-through confirmed SC#1 (Companies list/sort/search), SC#2 (cost breakdown table with correct windowed totals), SC#3 (Needs Review card list with count badge and both resolve paths), and SC#4 (admin resolve persists across a live PAX8 sync)
|
||||
- Confirmed the D-07/D-08 permission split: non-admin can view but not resolve (403 on resolve attempt)
|
||||
|
||||
## Task Commits
|
||||
|
||||
Verification-only plan — no source commits. This SUMMARY.md is the only artifact.
|
||||
|
||||
## Files Created/Modified
|
||||
None — this plan verifies work done in Plans 14-01 through 14-05.
|
||||
|
||||
## Decisions Made
|
||||
- Accepted 2 pre-existing, unrelated `itglue-search.test.ts` failures as out-of-scope for this phase's gate (verified identical failure against the pre-wave-1 base commit).
|
||||
|
||||
## Deviations from Plan
|
||||
None - plan executed exactly as written.
|
||||
|
||||
## Issues Encountered
|
||||
None.
|
||||
|
||||
## User Setup Required
|
||||
None - no external service configuration required.
|
||||
|
||||
## Next Phase Readiness
|
||||
Phase 14 is functionally and behaviorally complete. Ready for phase-level code review, regression gate, and goal verification.
|
||||
|
||||
---
|
||||
*Phase: 14-pax8-ui-surface*
|
||||
*Completed: 2026-07-11*
|
||||
Loading…
Add table
Add a link
Reference in a new issue