Commit graph

472 commits

Author SHA1 Message Date
464c02a7f4 docs(03-01): complete dashboard API + components plan summary 2026-05-03 16:51:30 -04:00
e5e444b36d docs(03): recover plan files and ROADMAP.md after planner worktree-base bug
The planner agent's commit (d597415) was created from a worktree branch
based on master rather than the current feature branch HEAD. The soft-reset
safety check staged a deletion of ROADMAP.md (which exists in the feature
branch but not master), and that deletion was bundled into the agent's
commit. The plan files themselves were never added to the index.

Recovery: stage the on-disk ROADMAP.md (with the planner's Phase 3 updates)
plus the two new PLAN.md files, and commit them cleanly.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-03 16:31:56 -04:00
170800fb43 docs(phase-03): record planning complete in state 2026-05-03 16:31:00 -04:00
d597415a2f docs(03): create phase plan 2026-05-03 16:28:27 -04:00
7455d1171a docs(phase-02): evolve PROJECT.md after phase completion 2026-05-03 16:17:25 -04:00
53b453d5af docs(phase-02): complete phase execution 2026-05-03 16:16:56 -04:00
8b33dd7955 test(02): persist human verification items as UAT 2026-05-03 16:16:53 -04:00
cc8a584f3f docs(02-02): complete mobile shell wiring plan
- SUMMARY.md: layout rewrite + nav/page.tsx deletion, all 15 phase requirements closed
- STATE.md: decisions, metrics, session recorded
- ROADMAP.md: Phase 02 marked Complete (2/2 plans done)
- REQUIREMENTS.md: SHELL-01, SHELL-05, DRAWER-06 marked complete
2026-05-03 16:12:25 -04:00
08467494bf docs(02-01): complete plan 02-01 shell components summary
- HeaderBar, BottomNav, MoreDrawer, analyzer placeholder created
- TypeScript and Next.js build both pass (273 routes)
- Requirements SHELL-02..04, SHELL-06, NAV-01..03, DRAWER-01..05 addressed
2026-05-03 16:05:11 -04:00
29ff7fd8fd docs(02): create phase plan 2026-05-03 14:48:41 -04:00
e67c51ec7c docs(02): generate context from PRD 2026-05-03 14:38:17 -04:00
9e29510721 docs(phase-01): evolve PROJECT.md after phase completion 2026-05-03 14:06:04 -04:00
8e6dcf01e1 docs(phase-01): complete phase execution 2026-05-03 14:05:36 -04:00
ca91390f1a test(01): persist human verification items as UAT 2026-05-03 14:03:05 -04:00
a293a4f662 docs(01-02): summarize PWA-04 safe-area utility gap closure
Closes the orphaned PWA-04 requirement flagged by 01-VERIFICATION.md.
Single edit to app/styles/brand.css adds @utility pt-safe and
@utility pb-safe; production build (load-bearing for Tailwind 4
@utility syntax) compiled successfully and emitted both classes
into the production CSS bundle.
2026-05-03 13:57:40 -04:00
4c641b9b16 docs(01-pwa-scaffolding): add gap closure plan 01-02 for PWA-04 safe-area utilities 2026-05-03 13:51:06 -04:00
76ced68ac1 docs(01-01): summarize PWA scaffolding plan execution
- Document manifest fields, viewport export shape, and verification results
- Record key decisions (theme_color #0075AD, background_color #FFFFFF,
  metadata.manifest API choice, icon reuse)
- No deviations from plan

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-03 13:39:55 -04:00
3c62240dc0 docs: create roadmap (8 phases) 2026-05-03 12:48:02 -04:00
7c6df27778 docs: define v1 requirements 2026-05-03 12:43:26 -04:00
d33b8b9131 chore: add project config 2026-05-03 12:41:40 -04:00
fe1401366f docs: initialize mobile shell redesign project 2026-05-03 12:38:56 -04:00
cf3b740d34 docs: map existing codebase 2026-05-03 12:32:06 -04:00