979554d4dc
docs(phase-24): mark 24-07 plan complete in ROADMAP (7/7)
...
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-08-05 23:19:29 -04:00
493d6daf6c
docs(phase-24): update tracking after wave 3 (plans 24-05, 24-06 complete)
...
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-08-05 20:39:58 -04:00
2b009573c4
docs(phase-24): update tracking after wave 2 (plans 24-02, 24-03, 24-04 complete)
...
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-08-05 20:27:11 -04:00
ecd4dabd67
docs(phase-24): update tracking after wave 1 (plan 24-01 complete)
...
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-08-05 20:17:42 -04:00
602c3bb7b5
docs(24): create phase plan
2026-08-05 19:18:13 -04:00
15e52280b5
docs(24): create phase plan — 7 plans in 4 waves for AWS Route 53 DNS sync
2026-08-05 19:09:15 -04:00
e9101b0d44
chore: archive v3.0 milestone files
2026-07-17 06:56:49 -04:00
f44cdd2910
docs(phase-23): update tracking after wave 3
2026-07-16 23:21:24 -04:00
a918b72d04
docs(23): gap-closure plan for AUTOGATE-03 idempotency defect (CR-01)
2026-07-16 22:54:19 -04:00
dadac5180d
docs(phase-23): update tracking after wave 2
2026-07-16 21:04:14 -04:00
b69558aae8
docs(phase-23): update tracking after wave 1
2026-07-16 19:42:35 -04:00
7048bf693a
docs(23): create phase plan
2026-07-16 19:31:58 -04:00
683e647984
docs(23): create phase plan (5 plans, 2 waves)
...
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01W6RuWdiUiXrPK6FLBHjtpY
2026-07-16 19:08:45 -04:00
8a11a9f331
docs(23): add Classification Disposition + Per-Client Automation Gate phase
...
Scoping a dedicated "User Awareness" verdict for confirmed phishing-simulation
reports (KnowBe4/Breach Secure Now) plus a per-company automation gate for the
parse/classify/report-to-ticket pipeline stages. Surfaced live during Phase 22
review of a real Breach Secure Now report (ticket 699415).
2026-07-16 18:25:27 -04:00
ced258bbda
docs(22): mark phase 22 complete — approval UI (LiveLink) shipped
...
All 6 plans merged: pure-logic extraction (resolver/default-params/timeline),
API read surface, evidence/classification/timeline cards, action-area card,
and the ticket-scoped review page + campaigns list + nav entry. Blocking
LiveLink checkpoint verified against a real Autotask ticket (numeric ticket
ID confirmed, no ticket_number fallback needed).
2026-07-16 15:40:30 -04:00
b4707ce962
docs(22): create phase plan (6 plans, 3 waves)
2026-07-16 13:46:09 -04:00
ec7c2114bf
docs(phase-21): complete phase execution
2026-07-16 12:19:06 -04:00
5d34dc3506
docs(phase-21): update tracking after wave 2
2026-07-16 12:16:20 -04:00
4bbea170b2
docs(phase-21): update tracking after wave 1
2026-07-16 12:08:43 -04:00
b0a15f30f2
docs(21): create phase plan
2026-07-16 11:28:19 -04:00
f276dda754
docs(phase-20): update tracking after wave 2
2026-07-16 10:46:32 -04:00
4b3188da33
docs(phase-20): update tracking after wave 1
2026-07-16 10:41:23 -04:00
948a218d86
docs(20): create phase plan
2026-07-16 10:29:49 -04:00
af75580dc0
docs(phase-19): update tracking after wave 2 — phase complete
2026-07-16 08:27:56 -04:00
28f28a87a4
docs(phase-19): update tracking after wave 1
2026-07-16 08:23:11 -04:00
ef55e6dfd3
docs(19): create phase plan
2026-07-16 07:49:00 -04:00
9c69b9033c
docs(18): document CR-03 duplicate-campaign gap found via live verification
2026-07-15 23:44:57 -04:00
a48c0583bd
test(18): persist human verification items as UAT
2026-07-15 22:44:19 -04:00
d3373ab708
docs(phase-18): update tracking after gap-closure wave
2026-07-15 22:28:22 -04:00
ea71579fb0
fix(phase-18): revert premature roadmap completion marker after gaps_found verification
2026-07-15 19:49:37 -04:00
95859660d6
docs(phase-18): update tracking after wave 2
2026-07-15 19:34:50 -04:00
c77b7edae7
docs(phase-18): update tracking after wave 1
2026-07-15 19:27:40 -04:00
808604e861
docs(18): create phase plan (3 plans, 2 waves)
2026-07-15 16:45:29 -04:00
fc7e47532b
docs(phase-17): update tracking after wave 1
2026-07-15 14:31:59 -04:00
7303b16cbb
docs(17): create phase plan (1 plan, 1 wave)
2026-07-15 13:44:14 -04:00
40268e709f
docs(phase-16): update tracking after wave 2
2026-07-15 10:42:00 -04:00
36ef9e7ce3
docs(phase-16): update tracking after wave 1
2026-07-15 10:33:49 -04:00
00b8afc546
docs(16): create phase plan (3 plans, 2 waves)
2026-07-15 10:04:31 -04:00
664dfcb763
docs(phase-15): complete phase execution
2026-07-15 08:22:05 -04:00
35339a62b8
docs(phase-15): update tracking after wave 3
2026-07-15 07:51:46 -04:00
191a8c7210
docs(phase-15): update tracking after wave 2
2026-07-15 07:45:47 -04:00
6dffb7b358
docs(phase-15): update tracking after wave 1
2026-07-15 07:39:39 -04:00
3f8e8dc826
docs(phase-15): create phase plan
...
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_012wWroM6FXkQJiH3JgYcony
2026-07-15 07:17:10 -04:00
0228639f24
docs: create milestone v3.0 roadmap (7 phases)
2026-07-14 23:52:00 -04:00
37f81017f5
docs(phase-14): complete phase execution
2026-07-12 18:29:11 -04:00
1f5a65ecc1
docs(phase-14): update tracking after wave 4
2026-07-11 15:09:40 -04:00
3bf0244648
docs(phase-14): update tracking after wave 3
2026-07-11 14:46:09 -04:00
e9d5846cc8
docs(phase-14): update tracking after wave 2
2026-07-11 14:39:01 -04:00
8e1114aeec
docs(phase-14): update tracking after wave 1
2026-07-11 14:33:19 -04:00
386528a011
docs(14): create phase plan — /pax8 UI surface (6 plans, 4 waves)
...
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01LHRgZqkzBHBbAbc3KHneuR
2026-07-11 13:51:00 -04:00