wulf-pulse/.planning
lorentz 52afdca8a1 docs(24-07): resolve live end-to-end checkpoint — all 9 steps passed
Ran the phase-closing 9-step live verification against the real
wulfconsulting.com hosted zone. All steps confirmed passing:
sync, create/update/delete round-trip, audit completeness, NS-write
rejection + genuine AWS failure logging, admin/user auth gating,
drift detection, and D-12/D-10 health-check behavior.

One real bug found and fixed along the way (commit 4da5664): TXT
record values weren't RFC-1035-quoted, so AWS rejected every TXT
create/update with InvalidCharacterString. Fixed in
route53-change-submit.ts, 4 regression tests added, retried
successfully.

Logged one pre-existing, unrelated finding: /admin/integrations page
load is slow overall, confirmed not specific to Route 53's own health
check (which is bounded to a few seconds) — likely another
integration's untimeouts liveCheck() probe. Deferred, not fixed.

24-VALIDATION.md's three Manual-Only Verifications rows updated with
observed outcomes; status marked complete.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-08-05 22:55:27 -04:00
..
codebase fix(04-01): restore phase 2/3 work lost by worktree soft-reset 2026-05-03 18:01:14 -04:00
milestones chore: archive v3.0 milestone files 2026-07-17 06:56:49 -04:00
phases docs(24-07): resolve live end-to-end checkpoint — all 9 steps passed 2026-08-05 22:55:27 -04:00
quick docs(quick-260721-n49): fix classifier to resolve per-company Mimecast tenant instead of the global tenant 2026-07-21 16:48:11 -04:00
reports docs(v3.0): add LLM-context companion doc for phishing triage feature 2026-07-18 11:22:09 -04:00
research docs: capture exploration — PAX8 integration scope 2026-07-10 11:45:11 -04:00
seeds docs: capture exploration — PAX8 integration scope 2026-07-10 11:45:11 -04:00
config.json chore: check in pending work — queue preferences, QBO AR diagnostics, mobile engagement fixes, ops scripts 2026-07-18 06:34:57 -04:00
deferred-items.md docs(10-03): log pre-existing tsc errors as deferred (unrelated to plan) 2026-07-10 17:45:00 -04:00
MILESTONES.md chore: archive v3.0 milestone files 2026-07-17 06:56:49 -04:00
PROJECT.md chore: archive v3.0 milestone files 2026-07-17 06:56:49 -04:00
RETROSPECTIVE.md docs: update retrospective for v3.0 2026-07-17 06:57:43 -04:00
ROADMAP.md docs(phase-24): update tracking after wave 3 (plans 24-05, 24-06 complete) 2026-08-05 20:39:58 -04:00
STATE.md docs(phase-24): update tracking after wave 1 (plan 24-01 complete) 2026-08-05 20:17:42 -04:00
v2.0-MILESTONE-AUDIT.md docs(milestone-v2.0): add milestone audit report 2026-07-11 07:56:22 -04:00