wulf-pulse/.planning/v2.0-MILESTONE-AUDIT.md

8.6 KiB
Raw Permalink Blame History

milestone audited status scores gaps tech_debt nyquist
v2.0 2026-07-11T11:55:44Z gaps_found
requirements phases integration flows
9/14 3/5 8/8 1/1
requirements integration flows
id status phase claimed_by_plans completed_by_plans verification_status evidence
PAX8-07 unsatisfied Phase 13
missing Phase 13 (Scheduler & Admin Toggle) has not been discussed, planned, or executed. No PLAN.md/SUMMARY.md exist.
id status phase claimed_by_plans completed_by_plans verification_status evidence
PAX8-09 unsatisfied Phase 13
missing Same as PAX8-07 — Phase 13 not yet started.
id status phase claimed_by_plans completed_by_plans verification_status evidence
PAX8-12 unsatisfied Phase 14
missing Phase 14 (/pax8 UI Surface) has not been discussed, planned, or executed.
id status phase claimed_by_plans completed_by_plans verification_status evidence
PAX8-13 unsatisfied Phase 14
missing Same as PAX8-12 — Phase 14 not yet started.
id status phase claimed_by_plans completed_by_plans verification_status evidence
PAX8-14 unsatisfied Phase 14
missing Same as PAX8-12 — Phase 14 not yet started.
finding severity affected_requirements evidence
GET /api/pax8/sync status endpoint under-reports warning
PAX8-06
PAX8-10
PAX8-11
app/api/pax8/sync/route.ts GET handler's counts query only selects pax8_companies/pax8_subscriptions/pax8_products (written in Phase 11). Phase 12 added pax8_orders, pax8_order_items, and pax8_company_match_review and wired their sync into the same fullSync() this route triggers, but never extended the status query. Data lands correctly in Postgres (proven directly in 12-05-SUMMARY.md), but an admin polling this endpoint today has zero visibility into whether PAX8-06/10/11 actually ran.
phase items
11-company-catalog-subscription-sync
Pre-existing tsc errors in lib/services/sync-scheduler.ts:446,450 (missing appgate-factory/appgate-sync-service modules) — untracked WIP unrelated to PAX8, reproduces before and after this phase's changes
phase items
12-orders-invoices-company-matching
Same pre-existing sync-scheduler.ts TS2307 errors reproduce unchanged across all 5 plans
2 pre-existing itglue-search.test.ts failures (unrelated file, last touched in commit a0a6e7f well before Phase 12)
GET /api/pax8/sync status endpoint not extended for orders/company-matches (see integration gap above)
IN-03 (accepted, informational): Pax8InvoiceItem.forCompanyId vs .companyId ambiguity — only companyId is read; live-verified correct for sampled data
compliant_phases partial_phases missing_phases overall
10-pax8-client-auth-foundation
12-orders-invoices-company-matching
11-company-catalog-subscription-sync
partial

Milestone v2.0 — PAX8 Integration — Audit Report

Scope

5 phases planned for this milestone. 3 executed and verified (Phases 10, 11, 12). 2 not yet started (Phase 13: Scheduler & Admin Toggle; Phase 14: /pax8 UI Surface).

This audit reflects the milestone's current state, not a false claim of completion — the gaps_found status below is expected given 2 of 5 phases remain unbuilt, not a defect in the work that has shipped.

Phase Verification Summary

Phase Status Requirements Notes
10. PAX8 Client & Auth Foundation ✓ passed PAX8-01, PAX8-02
11. Company, Catalog & Subscription Sync ✓ passed PAX8-03, PAX8-04, PAX8-05, PAX8-08 No VALIDATION.md (Nyquist missing)
12. Orders/Invoices & Company Matching ✓ passed PAX8-06, PAX8-10, PAX8-11 Code-reviewed (2 critical + 3 warning fixed), UAT 7/7, security 9/9 closed, Nyquist compliant
13. Scheduler & Admin Toggle not started PAX8-07, PAX8-09
14. /pax8 UI Surface not started PAX8-12, PAX8-13, PAX8-14

Requirements Coverage (3-Source Cross-Reference)

REQ-ID Description Phase VERIFICATION SUMMARY frontmatter REQUIREMENTS.md Final Status
PAX8-01 OAuth2 client-credentials auth 10 passed listed [x] satisfied
PAX8-02 isPax8Configured() helper 10 passed listed [x] satisfied
PAX8-03 Sync companies 11 passed listed [x] satisfied
PAX8-04 Sync subscriptions 11 passed listed [x] satisfied
PAX8-05 Sync product catalog 11 passed listed [x] satisfied
PAX8-08 Read-only sync operations 11 passed listed [x] satisfied
PAX8-06 Sync orders/invoices (historical) 12 passed listed [x] satisfied
PAX8-10 Fuzzy company auto-match 12 passed listed [x] satisfied
PAX8-11 Flag unmatched/ambiguous, never guess 12 passed listed [x] satisfied
PAX8-07 Daily sync via cron 13 missing absent [ ] unsatisfied (phase not started)
PAX8-09 Toggle via /admin/integrations 13 missing absent [ ] unsatisfied (phase not started)
PAX8-12 Manual match resolution UI 14 missing absent [ ] unsatisfied (phase not started)
PAX8-13 /pax8 page: companies/subscriptions/cost 14 missing absent [ ] unsatisfied (phase not started)
PAX8-14 /pax8 page surfaces flagged matches 14 missing absent [ ] unsatisfied (phase not started)

No orphaned requirements — every REQ-ID in the traceability table maps to a real phase; the 5 unsatisfied ones are correctly tracked as "Pending" and their phases genuinely haven't run yet.

Cross-Phase Integration (Phases 1012 only, per scope)

8/8 expected connections wired. 0 orphaned exports. 0 hard breaks.

Full fullSync() dependency chain traced and verified against live data (12-05-SUMMARY.md: 94 invoices, 29,696 order items, 80 auto-matches, 38 flagged, idempotent across 2 runs): syncCompaniessyncSubscriptions (+ referencedProductIds) → syncProductssyncOrderssyncCompanyMatches

Schema cross-check: every INSERT column list in pax8-sync-service.ts verified against migrations 091/092/093/094/095 — no positional param/column mismatches found. pax8_company_match_review upsert's ON CONFLICT clause matches the exact partial unique index in migration 091.

Integration Finding (Warning, not a blocker)

GET /api/pax8/sync status endpoint under-reports (affects PAX8-06, PAX8-10, PAX8-11 visibility)

The status endpoint's counts query (written in Phase 11) only selects pax8_companies/pax8_subscriptions/pax8_products. Phase 12 added pax8_orders, pax8_order_items, and pax8_company_match_review, wired their sync into the same fullSync() this route triggers, but never extended the status query to report them. Data lands correctly (proven by direct DB assertions), but today's only read surface for PAX8 sync status has zero visibility into orders/invoices/matching activity. Not a blocker — recommend fixing before or during Phase 14, since the /pax8 UI page will likely want this same status data.

Nyquist Compliance

Phase VALIDATION.md Compliant Action
10 exists true
11 missing /gsd:validate-phase 11
12 exists true

Tech Debt (accumulated, non-blocking)

Phase 11 & 12 (recurring):

  • Pre-existing lib/services/sync-scheduler.ts:446,450 TS2307 errors (missing appgate-factory/appgate-sync-service modules) — untracked WIP unrelated to PAX8, confirmed reproducing unchanged across both phases' plans
  • 2 pre-existing lib/services/analyzer/itglue-search.test.ts failures (unrelated file, last touched well before Phase 12)

Phase 12:

  • GET /api/pax8/sync status endpoint gap (see Integration Finding above)
  • IN-03 (accepted, informational, from 12-REVIEW.md): Pax8InvoiceItem.forCompanyId vs .companyId field ambiguity — only companyId is read; live-verified correct for the sampled data

Verdict

gaps_found — driven entirely by 2 of 5 milestone phases not yet being built (Phase 13, Phase 14). Everything that HAS shipped (Phases 1012) is fully wired, verified, security-audited, and Nyquist-covered except for one missing VALIDATION.md (Phase 11) and one non-blocking status-endpoint gap.