wulf-pulse/.planning/STATE.md

5.9 KiB

gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v3.0 Phishing Triage Automation completed Phase 23 context gathered 2026-07-16T22:37:09.984Z 2026-07-16 -- Phase 22 marked complete
total_phases completed_phases total_plans completed_plans percent
9 8 24 24 89

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-07-14)

Core value: A manager/security operator can see every phishing/spam report ticket automatically triaged, deduplicated into campaigns, and classified — with any destructive remediation gated behind explicit human approval. Current focus: Phase 22 — approval-ui-livelink-addressable-campaign-review-and-approve

Current Position

Phase: 22 — COMPLETE Plan: 1 of 6 Status: Phase 22 complete Last activity: 2026-07-16 -- Phase 22 marked complete

Progress: [░░░░░░░░░░] 0%

Performance Metrics

Velocity:

  • Total plans completed: 60 (v1.0: 42, v2.0: 20 across phases 10-14 — see per-phase table)
  • Average duration: —
  • Total execution time: 0.0 hours (v3.0)

By Phase:

Phase Plans Total Avg/Plan
01-09.1 (v1.0) 34 - -
10-14 (v2.0) 20 - -
15-21 (v3.0) TBD - -
15 3 - -
18 5 - -
21 2 - -

Recent Trend:

  • Last 5 plans: — (v2.0 closed 2026-07-12; v3.0 not yet executed)
  • Trend: —

Updated after each plan completion

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • v3.0 roadmap: 7 phases (15-21), each a hard dependency on at least one predecessor except Phase 17 (Mimecast blast-radius), which only depends on the Phase 15 schema and could be built in parallel with Phase 16 (EML parser) if split across two workstreams — sequenced after 16 here for a single execution thread

  • The durable schema (campaigns/reports/messages/indicators/classifications/ remediation_actions/audit_events) lands in Phase 15, before any service that writes to it — new migration, next number after 096 (097+)

  • ACCESS-01 is mapped to Phase 18 (the first phase introducing /api/phishing/* routes) rather than a standalone terminal phase; every later phishing endpoint (19, 20, 21) is expected to continue enforcing the same requireAuth/requirePermission convention as a success-criteria carry-forward, not a re-mapped requirement

  • Classification (Phase 19) is sequenced after both Phase 17 (blast-radius) and Phase 18 (campaigns) since it needs both as inputs

  • Remediation/approval/audit (Phase 20) is sequenced after Phase 18 (campaigns) and Phase 19 (classifications) — can't approve/gate an action that doesn't reference either

  • Autotask triage note (Phase 21) is last — its content summarizes classification + blast radius + recommended/approved remediation state, so it has nothing to summarize until Phases 19-20 exist

Roadmap Evolution

  • Phase 22 added: Approval UI (LiveLink) — ticket-ID-addressable Pulse page (Autotask LiveLink target) showing campaign timeline, evidence, and classification, with approve/remediate/mark-false-positive wired to the Phase 20 APIs. Depends on Phase 19 + Phase 20 only; not functionally dependent on Phase 21 despite being numbered after it.

  • Phase 23 added: Classification Disposition + Per-Client Automation Gate — dedicated "User Awareness" verdict for confirmed phishing-simulation-vendor reports (currently forced into generic UNWANTED), plus an admin UI gate for per-company automatic vs. manual phishing pipeline execution. Surfaced live during Phase 22 review of a real Breach Secure Now report (ticket 699415) — the classifier already detects the simulation vendor and skips the THREAT tier, but has no distinct outcome to reflect it.

Pending Todos

None yet.

Blockers/Concerns

  • 2026-07-15 — Phase 18 gap closure (18-04): decision-coverage gate flagged D-02/D-03/D-04 (grouping-parameter decisions from original discuss-phase) as not literally cited in any plan's must_haves/truths. Overridden and proceeded — these decisions were already implemented in 18-01 (24h window, subject normalization, no-merge behavior) and independently confirmed correct by both 18-REVIEW.md and 18-VERIFICATION.md. Citation gap only, not an implementation gap.

Quick Tasks Completed

# Description Date Commit Directory
260712-ash Add PAX8 to admin sync overview page + detail page 2026-07-12 6ed6c66 260712-ash-add-pax8-to-the-admin-sync-overview-page
260716-n46 Fix Mimecast blast-radius future-end-date swallow bug + multi-tenant gap (per-company tenant resolution) 2026-07-16 9951e53 260716-n46-fix-mimecast-blast-radius-date-window-fu
260716-pgr Fix confidence display bug (0-1 scale rendered as raw percent, e.g. "1%" instead of "100%") 2026-07-16 3f16268 260716-pgr-fix-confidence-display-bug-in-classifica

Deferred Items

Items acknowledged and carried forward from previous milestone close:

Category Item Status Deferred At
Follow-up Tablet breakpoint (md:max-w-2xl) on mobile shell Deferred v1.0 close
Follow-up Real notification list behind Bell icon Deferred v1.0 close
Follow-up Scroll restoration on Engagement profile back navigation (partial fix only) Deferred v1.0 close

Session Continuity

Last session: 2026-07-16T22:37:09.979Z Stopped at: Phase 23 context gathered Resume file: .planning/phases/23-classification-disposition-per-client-automation-gate/23-CONTEXT.md